ELEVATING THE EXPERIENCE

WELLNESS AT WOODSIDE

At Woodside, we are dedicated to continually evolving our best-in-class luxury amenities. Renovations to our Hydrotherapy Space, Locker Rooms and Yoga Studio will begin shortly after Labor Day. Every detail has been thoughtfully designed to engage the senses and deliver a new standard of wellness.

In preparation for the anticipated start of construction, we will begin transitioning our North Club Lower Level facilities on Tuesday, September 8. We expect construction to last approximately 4-5 months total, with some spaces reopening earlier in phases. We will communicate specific detailed updates regarding closures and reopenings to members throughout the project.

Continue reading for an overview of the project and an exclusive preview of the architectural renderings that bring our vision to life.

In preparation for the anticipated start of construction, we will begin transitioning our North Club Lower Level facilities on Tuesday, September 8.  We expect construction to last approximately 4-5 months total, with some spaces reopening earlier in phases. We will communicate specific detailed updates regarding closures and reopenings to members throughout the project.

Continue reading for an overview of the project and an exclusive preview of the architectural renderings that bring our vision to life.

NORTH CLUB LOWER LEVEL ACCESS
The North Club Lower Level, with the exception of The Spa + The Shop, will be closed to members beginning Tuesday, September 8. This closure includes the Locker Rooms, Hydrotherapy Space and Yoga Studio.

ADULT POOLS ACCESS
The Adult Pools will be closed to members beginning Tuesday, September 8. The Lap Pool will be open daily to members 21+ beginning Tuesday, September 8 from 11AM – 8PM. Entry to the Lap Pool will be through the Pool House Gate.

LOCKERS
All members who have rented lockers must remove their belongings no later than Monday, September 7 at 8PM. There will be no access to the locker rooms beginning Tuesday, September 8.

If you would like to express interest in a rented locker upon completion of renovations to the Locker Rooms, please use our Locker Inquiry form.

TEMPORARY SHOWER FACILITIES
Beginning Tuesday, September 8, a temporary shower facility with eight private shower stalls, including one ADA accessible stall, will be available adjacent to the South Club. A Woodside Club Attendant will be dedicated to this facility throughout each day and will be responsible for fully cleaning and sanitizing each stall after every use. Our current Malin + Goetz amenities – shampoo, conditioner, body wash – and towels will continue to be available.

YOGA STUDIO
Beginning Tuesday, September 8, the Yoga Studio will close, and more than two-thirds of our current Yoga Studio-based classes will shift to the Fitness Studio. The revised Group Fitness schedule can be found here.

THE SPA
The Spa will remain open on a limited schedule throughout construction. The Spa will close during particularly noisy demolition days in the construction timeline to protect the member experience.

THE SHOP
The Shop will remain open at any time The Spa is open for appointments. The Shop South Club will remain open for apparel purchases. A series of pop-ups for members to stock up on skincare products will be available.

NORTH CLUB UPPER LEVEL
The North Club Upper Level is expected to remain open throughout the renovation, though brief closures or service disruptions may be necessary during scheduled water or power transitions. Members will be notified in advance whenever possible.

DEDICATION TO GROWTH WITH OUR MEMBERS IN MIND